
Add to Cart
Hydraulic Cylinder Honed Steel Carbon Seamless Tube
Torich is a professional manufacturer and exporter of steel tubes with over 20 years experience.
It is an international marketing and sales company specialized in steel tubes, which holds the factories of Steel Tubes.
Usually the delvery time is 30-45days, if the goods are in stock, it is 10-15days.
The packaging is in bundles or in wooden box.
Description
Product Name | Hydraulic Cylinder Honed Steel Carbon Seamless Tube |
Material | Grade A, Grade B, Grade C, E235, E275, st37, st52, st35.8, S235JRH,ect. |
OD | 3.2- 720 mm |
WT | 0.5-8mm |
Length | As customer's require |
Oiled or Non-oiled | Non-oiled |
Delivery Time | 30-45 work days |
Application | Fluid Pipe, Boiler Pipe, Drill Pipe, Hydraulic Pipe,Gas Pipe, ect |
Standard | API 5L,ASTM A53/106/210, EN 10216,EN10210, EN10297, DIN 1629, DIN 2391,JIS G3444,JIS G3475,JIS G3455, ect |
Package | in bundles or in wooden box |
Standard and material
ASTM A53 | Grade A, Grade B |
ASTM A106 | Grade A, Grade B, Grade C |
EN10297 | E235, E275, E315 |
EN10210 | S235JRH, S275J0H, S275J2H |
DIN 1629 | st37 , st52 |
DIN 2391 | st35, st45, st52 |
DIN 17175 | st35.8, st45.8 |
JIS G3444 | STK290, STK400, STK500 |
JIS G3455 | STS370, STS410 |
Technique
Hot rolled |
Cold Drawn |
Cold Rolled |
Production of Hydraulic Cylinder Carbon Seamless Steel Tube:
FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-45 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.