TORICH INTERNATIONAL LIMITED

TORICH INTERNATIONAL LIMITED The Steel Tube Maker

Manufacturer from China
Verified Supplier
11 Years
Home / Products / Precision Steel Tube /

DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn

Contact Now
TORICH INTERNATIONAL LIMITED
Visit Website
City:ningbo
Province/State:zhejiang
Country/Region:china
Contact Person:MrRichard SHEN
Contact Now

DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn

Ask Latest Price
Video Channel
Brand Name :TORICH
Model Number :DIN2391
Certification :ISO9001, TS16949
Place of Origin :CHINA
MOQ :1 ton
Payment Terms :T/T, L/C, D/A, D/P, Western Union, MoneyGram
Supply Ability :6000 ton/year
Delivery Time :45-60 days
Packaging Details :in bundles with seaworthy packing
Price :Negotiable
Product name :DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn
Standard :DIN2391
Technique :Cold Drawn
Section shape :Round
Alloy or not :Non-alloy
Secondary or not :Non-secondary
Special tube :Precision Seamless Steel Tube
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn

Standard: DIN2391

Technique: Cold Drawn, Cold Rolled.

Size range: OD: 4-76mm, WT:0.5-8mm, Length: ≤12m, or at buyer's request.

Material: ST35,ST37.4,ST45,ST52.4 etc

Surface: NBK, Galvanization/Galvanized/Zinc Coated, Blue White Zinc (Trivalent Chromium Passivation),

Plating Colour Zinc(Trivalent Chromium Passivation), Yellow, Army-Green, Phosphated/Black Phosphated.

Surface quality: Without oxidization, No crack, No fold, No rolling fold, No scar, No laminar defect.

What we can do in our testing center

Physis laboratory,Chemical spectrometer, Pressure blasting machine, Metallographic analysis, Salt Spray Test

Delivery condition:

BK (+C) Cold finished/hard No heat treatment after the last cold forming process.
BKW (+LC) Cold finished/soft After the last heat treatment there is a light finishing pass (cold drawing).
BKS (+SR) Cold finished/stress relieve annealed.

After the final cold forming process the tubes are stress relieve annealed.

GBK (+A) Annealed.

After the final cold forming process the tubes are annealed in a controlled atmosphere.

NBK (+N) Normalized.

After the final cold forming process the tubes are annealed above the upper transformation point in a controlled atmosphere

Production routing:

Quality carbon steel from bao steel etc big mill, cold drawing the heat treatment without oxidization , NBK condition.

Do nondestructive testing ,HT tests and do dipping oil antirust protection, Packed tube in wooden boxes.

Main feature:

High precision

Excellent brightness

No oxidization on outer and inner walls after heat treatment

High cleanness of inside wall

High pressure

No deformation after clod bending

No crack after flaring and flattening

Prodct Show of Galvanized Precision Steel Tubes

DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold DrawnDIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn

Application of Galvanized Precision Steel Tubes

DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold DrawnDIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn

Our Certifications

DIN2391 ST45 Galvanized Precision Steel Tubes GBK Cold Rolled or Cold Drawn

QUALITY CONTROL:

1. Incoming Raw Material Inspection

2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking

100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects

FAQ

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.


Q: Do you provide samples of carbon seamless steel tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.


Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


If you have another question, pls feel free to contact us.











Inquiry Cart 0