TORICH INTERNATIONAL LIMITED

Manufacturer from China
Verified Supplier
11 Years
Home / Products / Seamless Steel Tube /

Boiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel Tubes

Contact Now
TORICH INTERNATIONAL LIMITED
Visit Website
City:ningbo
Province/State:zhejiang
Country/Region:china
Contact Person:MrRichard SHEN
Contact Now

Boiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel Tubes

Ask Latest Price
Video Channel
Brand Name :Torich
Model Number :ASME SA210
Certification :ISO
Place of Origin :China
MOQ :2 Tons
Price :USD 850 - 1200 per Ton
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :5000 Tons per Year
Delivery Time :30 - 45 days
Packaging Details :Seamless Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing.
Product name :Boiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel Tubes
Key word :Boiler Steel Pipe
Standard :ASTM A210 / ASME SA210
Application :Boiler Pipe
Grade :10#, 20#, Q195, Q215, Q235
Section shape :Round
Alloy or not :Non-alloy
Secondary or not :Non-secondary
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Boiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel Tubes

Product Description

This specification covers minimum-wall-thickness, seamless medium-carbon steel, boiler tubes and boiler flues, including e ends (This type is not suitable for e ending by forge welding), arch and stay tubes, and superheater tubes.

Standard ASTM A210/ ASME SA210
O.D. 12.7 - 127 mm
W.T. 1 - 15 mm
Length Max 12000 mm
Application Boiler, superheater and etc.
Surface Finish Oiled

Steel Grade and Chemical Compositions:
Grade C Mn P S Si
A-1 ≤0.27 ≤0.93 ≤0.035 ≤0.035 ≥0.10
C ≤0.35 0.29-1.06 ≤0.035 ≤0.035 ≥0.10

Mechanical proporties
Grade Tensil Strength
Mpa(ksi)
Yield Point
Mpa(ksi)
Elongation
A-1 ≥255(37) ≥415(60) ≥30%
C ≥275(40) ≥485(70) ≥30%

Product Show

Boiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel TubesBoiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel TubesBoiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel TubesBoiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel Tubes

Boiler Tubing Superheater Pipe ASME SA210 Seamless Medium Carbon Steel Tubes

FAQ

Q: Are you trading company or manufacturer ?

A: A professional steel pipes materials inventor, manufacturer and solution provider

Q: How long is your delivery time?

A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us.




Inquiry Cart 0