TORICH INTERNATIONAL LIMITED

TORICH INTERNATIONAL LIMITED The Steel Tube Maker

Manufacturer from China
Verified Supplier
11 Years
Home / Products / Precision Steel Tube /

Cold Drawn GB/T18254 ASTM A295 High Carbon Precision Bearing Steel Tube

Contact Now
TORICH INTERNATIONAL LIMITED
Visit Website
City:ningbo
Province/State:zhejiang
Country/Region:china
Contact Person:MrRichard SHEN
Contact Now

Cold Drawn GB/T18254 ASTM A295 High Carbon Precision Bearing Steel Tube

Ask Latest Price
Video Channel
Brand Name :TORICH
Model Number :GB/T18254
Certification :ISO
Place of Origin :Zhejiang, China
MOQ :500kg
Price :Negotiable
Payment Terms :L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :6000 tons per year
Delivery Time :15-30 days
Packaging Details :Packed in wooden boxes or seaworthy packing.
Product name :Cold Drawn GB/T18254 ASTM A295 High Carbon Precision Bearing Steel Tube
Technical :Hor Rolled, Cold Rolled, Cold Drawn
Standard :GB/T18254-2002,ASTM A295, ASTM A485, ASTM A534, GB/T3203
Steel Grade :GCr15, GCr18Mo, GCr15SiMo, GCr15SiMn, GCr4
Length :6M or as requirement
Type :hot rolling
Outer diameter :4-200 mm
Thickness :0.5-22 mm
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Cold Drawn GB/T18254 ASTM A295 High Carbon Precision Bearing Steel Tube

Product name: Cold Drawn GB/T18254 ASTM A295 High Carbon Precision Bearing Steel Tube
Standard: GB/T18254-2002,ASTM A295, ASTM A485, ASTM A534, GB/T3203, ASTM A866, ASTM A600, YB/T 688
Grade: GCr15, GCr18Mo, GCr15SiMo, GCr15SiMn, GCr4, G8Cr15, G20CrNi2MoA, G20Cr2Ni4A, G20CrNiMoA, 9Cr18, 9Cr18Mo, Cr4Mo4V, H10Cr4Mo4Ni4V, W9CrV2Mo, 2W10Cr3NiV, W10Cr4V, 52100, 4320, M50,50NiL, 100Cr6, 100CrMn6, 100CrMo7, 100Cr6, SKF3, SKF2, SKF24, SKF157, SUJ2, SUJ3, SUJ4, SNCM22
Technical: Cold Drawn Cold Rolled, Hot Rolled
Size Range:

OD: 4-200 mm

WT: 0.5-22 mm

Or according to customers' actual application and production.

Application: Rolling Bearing Rings

Chemcial composition

Grade C Mn P S Si Cr Ni Cu
52100 0.93-1.05 0.25-0.45 0.025 max 0.015 max 0.15-0.35 1.35-1.60 0.30 max 0.30 max

Heat Treatment:

Forging: 52100 bearing steel is forged at 1950 – 2100ºF (1065 – 1150ºC), and should not be forged below 1700ºF (925ºC.)

A post-forge equalization treatment is recommended at 1375ºF (745ºC) for 4-6 hours followed by air cooling.

Annealing: 52100 bearing steel is annealed at 872°C (1600°F) followed by slowly cooling to reduce cold working or machining stress.

Hardening: 52100 bearing steel is hardened by cold working, or heating and quenching. It can be carburized at 913°C (1675°F)

followed by quenching. It is again heated at 788°C (1450°F) followed by quenching for the second time.

GB/T18254 High Carbon Chromium bearing seamless tubeBearing Steel Tube

ASTM A295 Wearable high-carbon bearing seamless steel tube

ASTM A534 Wearable&cementite bearing seamless steel tube

JIS G4805 High-Carbon Chromium bearing seamless steel tube

Feature: High Dimensional Accuracy, Less Surface Decarburization,

High utilization rate and stable properties

Application: automotive, electrical, instrumentation,aerospace etc.

Product Show

Company Introduction

Packing and Delivery

Quality Control

1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.


100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.

FAQ:

Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and solution provider


Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.

Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.


If you have another question, pls feel free to contact us.








Inquiry Cart 0