
Add to Cart
TORICH Carbon Steel Cold Drawn Welded Tube Precision Steel Pipe DOM Steel Tube
EN10305-2 Cold Drawn Welded Precision Steel Tubes DOM tubing E155,E195,E235,E275,E355 +C +LC +SR +A +N
DOM is a process that is applied to tubing after it is initially constructed.It is refferred to as Seamless ,It can be said that do seamless process method on ERW tubes,So the tubes will have a high strength ,high quality .Material form E155 E195 E235 E275 E355 1020 1026 and so on .DOM tubing is commonly use in auto parts .
Production Process:
Cold rolling by Cold pilger machine and Cold rolling machine
Size: 6-350mm
WT: 1.0-35mm
1. Standard:
EN10305-2 Cold Drawn Precision Seamless Steel Pipes
2. Steel Grade:
E155,E195,E235,E275,E355, other materials upon agreement with customers.
Steel grade | Minimum values for the delivery conditionab | ||||||||||||
+CC | +LCC | +SR | +Ad | +N | |||||||||
steel name | steel number | RmMPa | A % | RmMPa | A % | RmMpa | ReHMPa | A % | RmMPa | A % | Rm MPa | ReHCMPa | A % |
E155 | 1.0033 | 400 | 6 | 350 | 10 | 350 | 245 | 18 | 260 | 28 | 270 to 410 | 155 | 28 |
E195 | 1.0034 | 420 | 6 | 370 | 10 | 370 | 260 | 18 | 290 | 28 | 300 to 440 | 195 | 28 |
E235 | 1.0908 | 490 | 6 | 440 | 10 | 440 | 325 | 14 | 315 | 25 | 340 to 480 | 235 | 25 |
E275 | 1.0225 | 560 | 5 | 510 | 8 | 510 | 375 | 12 | 390 | 21 | 410 to 550 | 275 | 21 |
E355 | 1.0580 | 640 | 4 | 590 | 6 | 590 | 435 | 10 | 450 | 22 | 490 to 630 | 355 | 22 |
a. Rm: tensile strength ; ReH: upper yield strength (but see 11.1); A: elongation. For symbols for the delivery condition see Table 1. | |||||||||||||
b. 1 Mpa = 1 N/mm2 | |||||||||||||
c. Depending on the degree of cold work in the finishing pass the yield strength may nearly be as high as the tensile strengths. For calculation purposes the following relations are recommended: | |||||||||||||
—— For delivery condition +C: ReH ≥0.8 Rm | |||||||||||||
—— For delivery condition +LC: ReH ≥0.7 Rm | |||||||||||||
d. For calculation purposes the following relations is recommended: ReH ≥0.5 Rm | |||||||||||||
e. For tubes with outside diameter ≤ 30 mm and wall thickness≤ 3mm, the ReH minimum values are 10 Mpa lower than the values given in this Table. |
3. Production method:
Cold drawn on the welded steel tubes, to reach high accuracy on the OD and WT tolerance
4. Packing:
In Hexagonal Bundles, with anti-rust oil protection, with seaworthy packing
5. Deliver condition:
1). +C No heat treatment after the final cold drawing process
2). +LC After the final heat treatment there is a suitable drawing pass
3). +SR After the final cold drawing process there is a stress relieve heat treatment in a controlled atmosphere
4). +A After the final cold drawing process the tubes are annealed in a controlled atmosphere
5). +N After the final cold drawing operation the tubes are normalized in a controlled atmosphere
Production Steel Tube:
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking.
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate longitudinal and transversal defects.
FAQ:
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples of honed tube ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.