TORICH INTERNATIONAL LIMITED

TORICH INTERNATIONAL LIMITED The Steel Tube Maker

Manufacturer from China
Verified Supplier
11 Years
Home / Products / Special Steel Pipe /

Non Alloy Seamless Special Steel Pipe Omega Tube Material 20G For Boilers

Contact Now
TORICH INTERNATIONAL LIMITED
Visit Website
City:ningbo
Province/State:zhejiang
Country/Region:china
Contact Person:MrRichard SHEN
Contact Now

Non Alloy Seamless Special Steel Pipe Omega Tube Material 20G For Boilers

Ask Latest Price
Video Channel
Brand Name :Torich
Model Number :BS, JIS, GB, DIN, ASTM, API,
Certification :ISO 9001:2008 , BV , ABS , CCS , DNV , GL ,PED
Place of Origin :China
MOQ :5MT
Price :negotiable
Payment Terms :L/C, T/T
Supply Ability :6000MT/Month
Delivery Time :30-45 days
Packaging Details :Standard seaworthy packing
Type :Special Steel Pipe
Material :SAE1010 , SAE1020 , SAE1035 , SAE1045 , ST37.0 , ST44 , ST52 , E235 , E355
Outer Diameter :5-420mm
Thickness :0.5-50mm
Section shape :Omega
Alloy Or Not :Non alloy
Surface Treatment :According to customer's requirement
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Non Alloy Seamless Special Steel Pipe Omega Tube Material 20G For Boilers

Special Steels Seamless Omega Tube, it is made by Carbon and Alloy Steel, produced by extrusion and cold drawn, the Omega Tubes are used in Boilers and Super Heaters etc, for better heating efficiency.

Product information:
Material: SAE1010 , SAE1020 , SAE1035 , SAE1045 , ST37.0 , ST44 , ST52 , E235 , E355
Grade: BS, JIS, GB, DIN, ASTM, API,
Shape: Omega
Wall thickness: 0.5-50mm
Length: up to 12m, or according to customer's requirement.
Outer diameter: Round: 5-420mm
Diameter and wall thickness could be at customer's request.
Technology: Cold Draw/Cold Rolled
Surface treatment: painted,galvanized,or oiled according to customer's requirement
Application: Lighting,furniture,medical equipments
Place of origin: China
Application Mechanical structure, Carbon pressure machinery etc.

Shipping & Payment:
Packaging: In bundles; or according to customer's requirements
MOQ: 5 MT
Terms of Delivery : FOB Shanghai
Terms of Parment : T/T, 30% advance payment, balance paid against B/L copy
Delivery time: Within 25-40 days since advance payment is receied

Non Alloy Seamless Special Steel Pipe Omega Tube Material 20G For Boilers Non Alloy Seamless Special Steel Pipe Omega Tube Material 20G For Boilers


Inquiry Cart 0